Jump to content

Search the Community

Showing results for tags 'developer'.



More search options

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Categories

  • Articles
    • Forum Integration
    • Frontpage
  • Pages
  • Miscellaneous
    • Databases
    • Templates
    • Media

Forums

  • Cars
    • General Car Discussion
    • Tips and Resources
  • Aftermarket
    • Accessories
    • Performance and Tuning
    • Cosmetics
    • Maintenance & Repairs
    • Detailing
    • Tyres and Rims
    • In-Car-Entertainment
  • Car Brands
    • Japanese Talk
    • Conti Talk
    • Korean Talk
    • American Talk
    • Malaysian Talk
    • China Talk
  • General
    • Electric Cars
    • Motorsports
    • Meetups
    • Complaints
  • Sponsors
  • Non-Car Related
    • Lite & EZ
    • Makan Corner
    • Travel & Road Trips
    • Football Channel
    • Property Buzz
    • Investment & Financial Matters
  • MCF Forum Related
    • Official Announcements
    • Feedback & Suggestions
    • FAQ & Help
    • Testing

Blogs

  • MyAutoBlog

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Found 6 results

  1. I am curious how they would do that? Are there any examples one can take a look? Will that affect any enbloc in any way?
  2. It's my first time buying a property, encountered problems with the defects rectification process and the mgt. Appreciate advice from experienced property buyers. Condo developer is a big established one, didn't expect the unit to be handed over in a bad and uncompleted condition. Moreover TOP of this condo has been delayed for 4 months. Among many other defects, the kitchen cabinet has many misalignments, a drawer track wasn't installed and was lying in the drawer (see pics), discoloration of cabinet surfaces, deep scratches on solid table top and stainless steel backing. Skirting missing. Chips on bathroom basin top. Marble flooring in living room was not polished and looks used. Dents on doors. After joint inspection with construction supervisor and developer Rep, I handed a key to them to do defects. Few days later I checked, nth has been done as expected. But neighbour who already moved in alerted that the workers have been entering my unit at 9+pm, wearing t-shirts and shorts, since the day I handed a key to the construction supervisor. I called defects team the next day and was advised to email my complaint. As expected, no reply nor response. Though they did a few minor defects. The big items like flooring etc all left undone. Only 2 weeks left before the one month defect rectification deadline is up, have a feeling they may tell me that those are not defects or not able to rectify. Or they may request more time though I already told them I need vacate my current residence by June. Though I can rectify the defects on my own after the one month and claim from developer, I'm not sure what complications may arise. Like developer not honouring the claim? I'm gg to meet a Rep from construction team regarding the defects. What stance should I take? Anyone with experience to advise?
  3. Orang Seletar sue Danga Bay Bay developer and other parties Johor Native claimed graveyards buried by Danga Bay developer Singapore has a very small population of Orang Seletar that lives in boats off Yishun Dam.
  4. hi all, can recommend ipad app developer? budget -+ 15k. thanks
  5. http://www.straitstimes.com/breaking-news/...s-khaw-20130107 i no look into the matter i already know liao....
  6. The developer did not cut cost on the construction material and design, I hope. http://sg.news.yahoo.com/blogs/singaporesc...214521-313.html Tombstone, coffin found at construction site in Yishun By farism | SingaporeScene
×
×
  • Create New...