Jump to content

New version of contactless immigration clearance system being trialled at Woodlands Checkpoint


 Share

Recommended Posts

Woodlands Checkpoint to Be Redeveloped in Phases; Construction to Commence In 2025

https://www.ica.gov.sg/news-and-publications/newsroom/media-release/woodlands-checkpoint-to-be-redeveloped-in-phases-construction-to-commence-in-2025

the causeway itself is not widened, open 100 counters at Woodlands also no use. only solution is one time immigration like RTS, and allocate some space for LTA to catch MY vehicles with outstanding SG fines. my $0.02. 

↡ Advertisement
  • Praise 1
Link to post
Share on other sites

On 1/29/2024 at 7:02 PM, Blueray said:

Woodlands Checkpoint to Be Redeveloped in Phases; Construction to Commence In 2025

https://www.ica.gov.sg/news-and-publications/newsroom/media-release/woodlands-checkpoint-to-be-redeveloped-in-phases-construction-to-commence-in-2025

the causeway itself is not widened, open 100 counters at Woodlands also no use. only solution is one time immigration like RTS, and allocate some space for LTA to catch MY vehicles with outstanding SG fines. my $0.02. 

If causeway widen, it means more cars can stuck there.

It is not ideal.

Ideally, both side have the same counter in operations.

Lastly, ICA should build more inbound counters (including those for lorries)

  • Praise 1
Link to post
Share on other sites

On 1/29/2024 at 8:18 PM, inlinesix said:

If causeway widen, it means more cars can stuck there.

It is not ideal.

Ideally, both side have the same counter in operations.

Lastly, ICA should build more inbound counters (including those for lorries)

ideally, both side staff all run by same country.

Link to post
Share on other sites

On 1/29/2024 at 8:18 PM, inlinesix said:

If causeway widen, it means more cars can stuck there.

It is not ideal.

Ideally, both side have the same counter in operations.

Lastly, ICA should build more inbound counters (including those for lorries)

 

On 1/29/2024 at 7:02 PM, Blueray said:

Woodlands Checkpoint to Be Redeveloped in Phases; Construction to Commence In 2025

https://www.ica.gov.sg/news-and-publications/newsroom/media-release/woodlands-checkpoint-to-be-redeveloped-in-phases-construction-to-commence-in-2025

the causeway itself is not widened, open 100 counters at Woodlands also no use. only solution is one time immigration like RTS, and allocate some space for LTA to catch MY vehicles with outstanding SG fines. my $0.02. 

Yah if wide road and wide holding area....is a bit like Tua's returning side at MY side, the queue just went haywire.

  • Haha! 1
Link to post
Share on other sites

Ideally it should be like both countries checking the inbound only and just share outbound with each other in real time so that all outgoing counters can be converted to incoming - instantly the counters are doubled.

Link to post
Share on other sites

Why make it easier for people to spend their hard earn S$ in JB

and pump 1/4 tank for us that law by law

and 95% tank for those petrol cheats?

:D

↡ Advertisement
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...