Jump to content

Johor Bahru-Singapore RTS link


Blueray
 Share

Recommended Posts

Supersonic
  On 7/30/2020 at 5:51 AM, Lala81 said:

How can a light rail system serve 10k passengers per hour?

With a every 3 minute departure, that would mean 20 departures/arrivals in 1 hr. And means a train would need to carry 500 passengers per trip?
WIth a 2min departure, that would still mean 330+ passengers departing every 2 mins.

Expand  

And how many lanes and manpower needed to clear 10k people per hour? Doubt currently both sides can even clear 5k/hr

↡ Advertisement
  • Praise 2
Link to post
Share on other sites

  On 7/30/2020 at 5:51 AM, Lala81 said:

How can a light rail system serve 10k passengers per hour?

With a every 3 minute departure, that would mean 20 departures/arrivals in 1 hr. And means a train would need to carry 500 passengers per trip?
WIth a 2min departure, that would still mean 330+ passengers departing every 2 mins.

Expand  

DepartUre and arrival is two Thing right

 

so in 1 hr based on 3 min interval there will be 20 departure and 20 arrival? 
 

so total will be 40 trips in one hour? 
 

so one trip about 250 passengers

Link to post
Share on other sites

Supersonic
  On 7/30/2020 at 5:51 AM, Lala81 said:

How can a light rail system serve 10k passengers per hour?

With a every 3 minute departure, that would mean 20 departures/arrivals in 1 hr. And means a train would need to carry 500 passengers per trip?
WIth a 2min departure, that would still mean 330+ passengers departing every 2 mins.

Expand  

At Woodlands customs, the Q will be so long that it stretches all the way back to JB.......lol

 

Link to post
Share on other sites

Turbocharged

Those motobikers will still continue to commute via bikes lah. Expect the jam to continue.

Link to post
Share on other sites

  On 7/30/2020 at 10:41 AM, Thaiyotakamli said:

DepartUre and arrival is two Thing right

 

so in 1 hr based on 3 min interval there will be 20 departure and 20 arrival? 
 

so total will be 40 trips in one hour? 
 

so one trip about 250 passengers

Expand  

The article said 10k per hour one way. 

  • Praise 1
Link to post
Share on other sites

  On 7/30/2020 at 3:40 PM, Wt_know said:

the bottleneck will be and always be custom clearance .... this need to be solved even with auto-gate

Expand  

Let's assume that autogate takes 2mins to clear each individual.

To clear 10k/hr, it will need 333 autogate.

😂

  • Haha! 3
Link to post
Share on other sites

(edited)
  On 7/31/2020 at 12:19 AM, inlinesix said:

Let's assume that autogate takes 2mins to clear each individual.

To clear 10k/hr, it will need 333 autogate.

😂

Expand  

the max probably install 30 autogate ... 

means during PEAK gotta wait 200mins?

sounds about right ... same old same old ... lol

Edited by Wt_know
  • Haha! 2
Link to post
Share on other sites

  On 7/30/2020 at 5:51 AM, Lala81 said:

How can a light rail system serve 10k passengers per hour?

With a every 3 minute departure, that would mean 20 departures/arrivals in 1 hr. And means a train would need to carry 500 passengers per trip?
WIth a 2min departure, that would still mean 330+ passengers departing every 2 mins.

Expand  

Based on the article Thaiyo posted, it is likely to mirror existing LRT line in KL.  That means there will be 6 cart.

  • Praise 2
Link to post
Share on other sites

(edited)
  On 7/31/2020 at 1:17 AM, Wt_know said:

the max probably install 30 autogate ... 

means during PEAK gotta wait 200mins?

sounds about right ... same old same old ... lol

Expand  

With RTS Link, there is NO car jam.

During peak hour, there is always ppl jam + car jam.

By the way, ICA autogate is running on Windows 98/2000.

Edited by inlinesix
  • Haha! 1
Link to post
Share on other sites

(edited)
  On 7/31/2020 at 1:24 AM, inlinesix said:

Based on the article Thaiyo posted, it is likely to mirror existing LRT line in KL.  That means there will be 6 cart.

Expand  

Some lines in taipei are light rail. Actually in a straight line, they are really quite fast. Much faster than our LRT haha [laugh]
But i think is max 4 cars.

Edited by Lala81
  • Praise 2
  • Haha! 1
Link to post
Share on other sites

Turbocharged

The system needs to come pre-built to handle capacity spike like during festive seasons where surge in border travels can be expected.

Link to post
Share on other sites

Supersonic
  On 7/31/2020 at 1:17 AM, Wt_know said:

the max probably install 30 autogate ... 

means during PEAK gotta wait 200mins?

sounds about right ... same old same old ... lol

Expand  

Yeah and wif the Q stretching from Woodlands back to Bkt Chagar

The RTS is just another opportunity for crony to huat

 

↡ Advertisement
  • Haha! 2
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...