What I have heard from some contractors is that the foreign workers quota is giving many companies a huge headache in terms of manpower.

 

In the past, when I ordered something from some supplier, they could always deliver. Now gotta pick up most of the stuff myself due to lack of manpower.

 

Could it be the case for some of these issues with these builders?

↡ Advertisement
  • Praise 3
Link to post
Share on other sites

Not taking any sides here but so many recent complains of poor quality, I wonder, is more due to customer much more picky nowadays or is the developer really CMI?

  • Praise 2
Link to post
Share on other sites

(edited)

customer picky is not something new ... customer has been picky since donkey years liao

developer want to build cheap and fast ... aberthen?

it's not just happening in spore ... as per my video about Canada Condo

 

Not taking any sides here but so many recent complains of poor quality, I wonder, is more due to customer much more picky nowadays or is the developer really CMI?

 

Edited by Wt_know
  • Praise 1
Link to post
Share on other sites

Twincharged

Honestly I do wonder if it's more cost effective to build quickly with numerous defects and to set up a team to rectify it over time with lots of negative press, or to build precisely and minimise defects so less of follow up issues and bad press / advertisements, which will manifest in good reviews and resale prices / confidence over time.

 

Maybe Toronto does not have professional grumblers and complainers like we do. I admit I can complain pretty well if I choose to do so, so not really pointing fingers at anyone.

Link to post
Share on other sites

Turbocharged

Not taking any sides here but so many recent complains of poor quality, I wonder, is more due to customer much more picky nowadays or is the developer really CMI?

 

both. social media helps to amplify complaints, n developers are screwed due to labour crunch n slow prop mkt

Link to post
Share on other sites

(edited)

harlow ah sim, we know not all units are perfect just like car got lemon car

the question is how many lemons produce ...

owner heng sway is one thing buying your project but if the project produce sibei many lemon unit ...

its only sway no heng ... [thumbsdown]

post-7984-0-98361500-1434158608_thumb.jpg

post-7984-0-24270300-1434158616_thumb.jpg

Edited by Wt_know
Link to post
Share on other sites

Win liao lor ,... industry standard also bring in and talk ...

 

At the end , those standard are bo standard one hahaha

  • Praise 7
Link to post
Share on other sites

(edited)

Sim lian may be local but the workers arenot. So LPPL la.

 

HDB should go back to basics by just providing bare minimum, just like the early 90s. The owners do their interior deco.

Problem solved.

 

HDB cannot smlj also want to earn.

 

sim liam....local developer.

 

so better not jeer at those ah tiong one but look at our standard first.

Edited by Babyckh
Link to post
Share on other sites

the problem now is not just deco and fancy stuff

basic like piping, floor, wall, glass window, door lock also CMI ... :yuush:

 

Sim lian may be local but the workers arenot. So LPPL la.

HDB should go back to basics by just providing bare minimum, just like the early 90s. The owners do their interior deco.
Problem solved.

HDB cannot smlj also want to earn.

 

Link to post
Share on other sites

Supersonic

The classic example is the contractor for JEM. Project is riddled with faults and poor materials and workmanship. Problems keep popping up even after 2-3 years. Hopeless.

  • Praise 1
Link to post
Share on other sites

(edited)

and now developer only give 1 year defect liability

after 1 year ... you are own your own even your toilet bowl choke up shit ... eewwww

just like our experience buying china made cheapskate electronic stuff ... once warranty is over very likely up lorry ...

 

The classic example is the contractor for JEM. Project is riddled with faults and poor materials and workmanship. Problems keep popping up even after 2-3 years. Hopeless.

 

Edited by Wt_know
Link to post
Share on other sites

Turbocharged

The classic example is the contractor for JEM. Project is riddled with faults and poor materials and workmanship. Problems keep popping up even after 2-3 years. Hopeless.

This one you must ask the smartie pants who oversaw the project at Lend Lease.

 

Then again, these days, everybody on focused on short term, maybe the smartie pants also jump ship to another company liao...the current fella clearing his shit literally.

Link to post
Share on other sites

my place which is considered new 2-3 years old after TOP has problem with aircon that leaks easily as most complaints by resident.

 

 

but bo pian contractor warrant of 1 year ald over

  • Praise 2
Link to post
Share on other sites

(edited)

haha ... kena labelled ... "LOUSY"

DBSS is overrated la ... that's why buyer expect "TOP" quality ... lol

post-7984-0-93129700-1434500472_thumb.jpg

Edited by Wt_know
↡ Advertisement
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...