Vhtfhwlego Supercharged September 26, 2014 Share September 26, 2014 Looks like we Changi Village will have a massive jam from today to 28th Sept 2014. Bloody Sinktel is having pipe laying road works at the left turn and vehicles can only use the right lane to exit the area. The right lane will be block if any vehicles want to turn right as it's a busy junction, vehicles will be safe to proceed only with right arrow. Was stuck at the area for a good 25mins. Why can't they close the right turn as the U-Turn already is not that far. Good luck to those working at Changi Airfreight, Alps & our Army boys. ↡ Advertisement Link to post Share on other sites More sharing options...
Volvobrick Supersonic September 26, 2014 Share September 26, 2014 Simple reason this sort of 100% preventable jams is happening all over sinkapoor - lack of interest nor control when issuing start work permit by LTA. 1 Link to post Share on other sites More sharing options...
Sosaria Twincharged September 26, 2014 Share September 26, 2014 Yup, absolutely no coordination. It's just as if they just throw up their hands in the air, and think we'll bear with it just as we have for so long. Now with so many comms companies, internet cable and what-not, snaking underground. Add together the power lines... Good luck! You often see the same stretch of road dug up and re-surfaced a few times in succession. Then the contractors are the lowest-bidder types, resulting in poor re-surfacing and the roads turning bumpy. And finally, when some MP or mini-star visiting the area... the contractor have to re-do the job up to standard. Roadblock again!! Link to post Share on other sites More sharing options...
Tohto Hypersonic September 26, 2014 Share September 26, 2014 All those work that involve closing of lane on the road should only be done during the mid night. Instead of during the day. I remember when I start driving in the late 80s and early 90s, road work was always done at mid-night to prevent any traffic delay. 1 Link to post Share on other sites More sharing options...
Mockngbrd Supersonic September 26, 2014 Share September 26, 2014 radx no more business Link to post Share on other sites More sharing options...
Mason016 Supersonic September 26, 2014 Share September 26, 2014 Looks like we Changi Village will have a massive jam from today to 28th Sept 2014. Bloody Sinktel is having pipe laying road works at the left turn and vehicles can only use the right lane to exit the area. The right lane will be block if any vehicles want to turn right as it's a busy junction, vehicles will be safe to proceed only with right arrow. Was stuck at the area for a good 25mins. Why can't they close the right turn as the U-Turn already is not that far. Good luck to those working at Changi Airfreight, Alps & our Army boys. Prepare for facebook posts on fights, accidents, road rage liao. Link to post Share on other sites More sharing options...
Playtime Twincharged September 26, 2014 Share September 26, 2014 All those work that involve closing of lane on the road should only be done during the mid night. Instead of during the day. I remember when I start driving in the late 80s and early 90s, road work was always done at mid-night to prevent any traffic delay. As long as you have residential homes near by, night Road work is rarely allowed as it is too noisy. Link to post Share on other sites More sharing options...
Adrianli Hypersonic September 26, 2014 Share September 26, 2014 Yah. Another stupid thing was having road works done during evening peak hour at Thomson Road. Thus creating a huge jam. All those stay north use Thomson Road home to avoid ERP on CTE and they allow road works to carryout during that peak hour. Was stuck in such jam a few time liao when they did road works along the polo club stretch, closing off the left lane. Link to post Share on other sites More sharing options...
Evillusion Supersonic September 26, 2014 Share September 26, 2014 Everywhere rd works...from my workplace in Bukit Batok to Woodlands.....even KJE not spared. Really boosting the economy through public works! Link to post Share on other sites More sharing options...
Little_prince Supersonic September 26, 2014 Share September 26, 2014 Looks like we Changi Village will have a massive jam from today to 28th Sept 2014. Bloody Sinktel is having pipe laying road works at the left turn and vehicles can only use the right lane to exit the area. The right lane will be block if any vehicles want to turn right as it's a busy junction, vehicles will be safe to proceed only with right arrow. Was stuck at the area for a good 25mins. Why can't they close the right turn as the U-Turn already is not that far. Good luck to those working at Changi Airfreight, Alps & our Army boys. IMG_2862.JPG near the indian temple there ah? 1 Link to post Share on other sites More sharing options...
Vhtfhwlego Supercharged September 26, 2014 Author Share September 26, 2014 near the indian temple there ah? Yap. Link to post Share on other sites More sharing options...
159er 5th Gear September 26, 2014 Share September 26, 2014 With the huge bottleneck, cannot imagine how those from the big carpark rejoin the main road... 1 Link to post Share on other sites More sharing options...
Darthrevan Supercharged September 26, 2014 Share September 26, 2014 All those work that involve closing of lane on the road should only be done during the mid night. Instead of during the day. I remember when I start driving in the late 80s and early 90s, road work was always done at mid-night to prevent any traffic delay. perhaps the migrant workers also need 'work-life balance' like the rest of us Link to post Share on other sites More sharing options...
Blueblueman 4th Gear September 26, 2014 Share September 26, 2014 All the timing for the buses will be ruin and everyone will be late! Luckily I turn left at Loyang ind est heng ar! 1 Link to post Share on other sites More sharing options...
Fcw75 Hypersonic September 26, 2014 Share September 26, 2014 When you see the govt many road works, you know that the economy is not so good and they are boosting it. 1 Link to post Share on other sites More sharing options...
Darthrevan Supercharged September 26, 2014 Share September 26, 2014 When you see the govt many road works, you know that the economy is not so good and they are boosting it. and the govt will stretch the projects as long as possible..eg. 1 month do slowly until become 3-6 months 1 Link to post Share on other sites More sharing options...
Celicar Turbocharged September 26, 2014 Share September 26, 2014 You want never-ending road works? Outside the State Courts. They have been digging there FOREVER Link to post Share on other sites More sharing options...
Ttbest 3rd Gear September 26, 2014 Share September 26, 2014 whats new, roads work as and when they like, couple of weeks ago, balestier road for lunch, took me 20mins to get foodcentre which normally takes 5, thks to road works ↡ Advertisement 1 Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In NowRelated Discussions
Related Discussions
LTA - how to improve roads ah?
LTA - how to improve roads ah?
SIM Only Mobile Plans Discussion
SIM Only Mobile Plans Discussion
Fibre broadband
Fibre broadband
3 years lock in period for vehicles registered from Feb 19 as business-owned private-hire cars, says LTA
3 years lock in period for vehicles registered from Feb 19 as business-owned private-hire cars, says LTA
LTA buys electric buses from China
LTA buys electric buses from China
Mother of ALL JAMs in at Checkpoint
Mother of ALL JAMs in at Checkpoint
LTA tweaks calculation of commercial vehicle COE quota to even out supply
LTA tweaks calculation of commercial vehicle COE quota to even out supply
New stations, line extensions planned for Singapore’s MRT
New stations, line extensions planned for Singapore’s MRT