Wind30 Turbocharged March 13, 2013 Share March 13, 2013 (edited) for those woodsville junction users at bendermeer, macpherson, upper serangoon road, give your opinons!!! then we can send the results to LTA and put on facebook :) Edited March 13, 2013 by Wind30 ↡ Advertisement Link to post Share on other sites More sharing options...
Wind30 Turbocharged March 13, 2013 Author Share March 13, 2013 I used to use that junction almost everyday in my previous job. After seeing the construction for 3 years, it is finally done but I changed jobs already. So was it all worth it??? personally I voted for a bit of improvement but not worth the money. They spent so much money digging tunnels to connect the upper serangoon, macpherson and bendermeer roads but the bulk of the traffic is actually coming to/from the PIE/CTE entrances and exits. Should have built some flyovers for these entrances/exits rather than the tunnels... now the ground level traffic junction is so complicated and slow.... dunno whether is an upgrade or a 130million downgrade. Link to post Share on other sites More sharing options...
Samuelftw Neutral Newbie March 13, 2013 Share March 13, 2013 Personally I stay at St.Barnabas Lane which is one of the minor road along Serangoon Road(Opp Bend Pri), I did see a great improvement from two years ago whereby bump to bumper jam was a common sight during weekday evening peak. But now, seldom experience any jams. However, $130M ? Might be too much ... Link to post Share on other sites More sharing options...
Vhtfhwlego Supercharged March 14, 2013 Share March 14, 2013 The Traffic congestion certainly improves but when you are asking whether it is worth the cost, I would say 100% worth it. Even it cost 10times more it's worthy of the price tag. Because, it's time for the LTA to give something back to us. Don't use it, it will not rebate to us in anyway. Link to post Share on other sites More sharing options...
Mustank Hypersonic March 14, 2013 Share March 14, 2013 You prefer ah gong use our marnie to improve infrastructure or use our marnie to buy angmo bank? Link to post Share on other sites More sharing options...
Blackyv Turbocharged March 14, 2013 Share March 14, 2013 Definitely much better spent than youth olympic... Link to post Share on other sites More sharing options...
Cklasse 1st Gear March 14, 2013 Share March 14, 2013 what is $130m? the COE money collected can easily pay for this. Link to post Share on other sites More sharing options...
Mightymito 1st Gear March 14, 2013 Share March 14, 2013 The comparison should be between today and five years ago and not two to three years ago. Because it was started five years ago. The major works were widening of the flyover and the tunnel. To me the tunnel seems to be a lot of money for just one lane which you can still bypass on the same old road and get to bendemeer. AND its still not completed as the contract also involves the reconstruction of the food centre. I doubt the old tenants would come back after so long. Link to post Share on other sites More sharing options...
Lionflyer Neutral Newbie March 14, 2013 Share March 14, 2013 I am staying in the area. I think there is definitely improvements in the stretch from Upper Serangoon Road to town (Boon Keng) using the tunnel. But I am disappointed with the direction from Toa Payoh down to Macpherson. They built an ramp for cars to get on the exit to Changi but few cars actually use it, but most importantly, the entire exit from Toa Payoh remained a 3 merged into 2 lanes. Always get jammed there when I take bus (I don't drive now). It's tough because they are bracketed by St Andrews on the side but I had hope that they could have expanded into 3 full lanes (1 bus lane, 2 normal lanes) Link to post Share on other sites More sharing options...
Dtan2626 Neutral Newbie March 14, 2013 Share March 14, 2013 I am staying in the area. I think there is definitely improvements in the stretch from Upper Serangoon Road to town (Boon Keng) using the tunnel. But I am disappointed with the direction from Toa Payoh down to Macpherson. They built an ramp for cars to get on the exit to Changi but few cars actually use it, but most importantly, the entire exit from Toa Payoh remained a 3 merged into 2 lanes. Always get jammed there when I take bus (I don't drive now). It's tough because they are bracketed by St Andrews on the side but I had hope that they could have expanded into 3 full lanes (1 bus lane, 2 normal lanes) I also stay this area, agree of wat u say on the st andrew part. Other than tat it does ease the traffic a bit. Link to post Share on other sites More sharing options...
Jamesc Hypersonic March 14, 2013 Share March 14, 2013 AND its still not completed as the contract also involves the reconstruction of the food centre. I doubt the old tenants would come back after so long. Damn, that food centre had very good food! Link to post Share on other sites More sharing options...
Roadie 1st Gear March 14, 2013 Share March 14, 2013 I used to stay at Whampoa south. There is a definitely a big improvement in the traffic flow. ↡ Advertisement Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In NowRelated Discussions
Related Discussions
Ang Mo Kio junction to be turned into temporary roundabout for North-South Corridor works
Ang Mo Kio junction to be turned into temporary roundabout for North-South Corridor works
Traffic junction without traffic lights
Traffic junction without traffic lights
Singapore's population hits 5.18 million as at end-June
Singapore's population hits 5.18 million as at end-June
Traffic accident deaths in Singapore spiked by 58% in first half of 2023
Traffic accident deaths in Singapore spiked by 58% in first half of 2023
India landed on the Moon for less than it cost to make Interstellar
India landed on the Moon for less than it cost to make Interstellar
No more walk-ins: Traffic e-Appeals Portal is only way to submit appeals
No more walk-ins: Traffic e-Appeals Portal is only way to submit appeals
Complex Braddell-Upper Serangoon-Bartley road junction to be simplified
Complex Braddell-Upper Serangoon-Bartley road junction to be simplified