Kb27 Supersonic October 6, 2016 Share October 6, 2016 So many MRT problems. They all have to be scrapped also ! Shutdown everything, dismantle SMRT. ↡ Advertisement 1 Link to post Share on other sites More sharing options...
Yewheng Twincharged October 6, 2016 Share October 6, 2016 If the current one they built cant even maintain properly, what makes them think building a new one will be better? Ya lor, Actually I feel overhull would be a better choice, Stripped the running cable, stripped the track, decommission LRT train and still remain the bare skalaton of the concrete track and train station. Then re add in new design, new trains with improved features and hopefully more power savings and add in power cables that able to run higher load etc.. This will be better then scrap the LRT train.. Link to post Share on other sites More sharing options...
Watwheels Supersonic October 6, 2016 Share October 6, 2016 I thought LRT is problematic right from the start? Anyway who takes LRT? Ppl staying in the area either take bus or drive car. It's good news that they want to scrap it. Link to post Share on other sites More sharing options...
Blueray Hypersonic October 6, 2016 Share October 6, 2016 Bt Panjang LRT will end up in Bandung. SMRT Corp has clarified that it has not received any official notification as to whether it has won a tender to build a public rail project in Bandung, Indonesia. The rail operator's statement to the Singapore Exchange on Monday night followed a Facebook post by Bandung mayor Ridwan Kamil last week. Mr Kamil had written that SMRT had won the bid for the LRT Corridor 1. http://www.straitstimes.com/business/smrt-clarifies-bandung-project-bid 2 Link to post Share on other sites More sharing options...
Kusje Supersonic October 6, 2016 Share October 6, 2016 Bt Panjang LRT will end up in Bandung. SMRT Corp has clarified that it has not received any official notification as to whether it has won a tender to build a public rail project in Bandung, Indonesia. The rail operator's statement to the Singapore Exchange on Monday night followed a Facebook post by Bandung mayor Ridwan Kamil last week. Mr Kamil had written that SMRT had won the bid for the LRT Corridor 1. http://www.straitstimes.com/business/smrt-clarifies-bandung-project-bid If this is true, their procurement process must be damn lousy. SMRT is the system operator and they had 0 experience building systems or planning for it. Heck, they can't even do proper maintenance. Link to post Share on other sites More sharing options...
Ken138 4th Gear October 6, 2016 Share October 6, 2016 Cannot solve the problem ... Scrapped it ... Would seem like an easy way not considering tax payer $ invested on the system.. Should scrap the pax instead for suggesting tat.. :( Link to post Share on other sites More sharing options...
RadX Moderator October 6, 2016 Share October 6, 2016 So many MRT problems. They all have to be scrapped also ! Shutdown everything, dismantle SMRT. Agree Build condo Cannot solve the problem ... Scrapped it ... Would seem like an easy way not considering tax payer $ invested on the system.. Should scrap the pax instead for suggesting tat.. :( Same lo Cannot maintain security, ban internet Link to post Share on other sites More sharing options...
Watwheels Supersonic October 6, 2016 Share October 6, 2016 (edited) Cannot solve the problem ... Scrapped it ... Would seem like an easy way not considering tax payer $ invested on the system.. Should scrap the pax instead for suggesting tat.. :( There will be endless critics in whatever they do. If they don't scrapped it ppl will ask why smrt is continually pouring in more money into a failed system? Turn left cannot, turn right also cannot. So how? Jump? Edited October 6, 2016 by Watwheels Link to post Share on other sites More sharing options...
Vid Hypersonic October 6, 2016 Share October 6, 2016 Walk lo Link to post Share on other sites More sharing options...
Kusje Supersonic October 6, 2016 Share October 6, 2016 Walk lo Got killer motorbikes on the foot path leh. Link to post Share on other sites More sharing options...
Sdf4786k Twincharged October 6, 2016 Share October 6, 2016 Ya lor, Actually I feel overhull would be a better choice, Stripped the running cable, stripped the track, decommission LRT train and still remain the bare skalaton of the concrete track and train station. Then re add in new design, new trains with improved features and hopefully more power savings and add in power cables that able to run higher load etc.. This will be better then scrap the LRT train.. Used polling and transfer decision to the people. If cost goes up becomes an inform choice.? Link to post Share on other sites More sharing options...
Vid Hypersonic October 6, 2016 Share October 6, 2016 Got killer motorbikes on the foot path leh. Then ride killer motorbikes on the foot path with them to MRT also lo. Link to post Share on other sites More sharing options...
Wt_know Supersonic October 6, 2016 Share October 6, 2016 (edited) wah ... if BP LRT is scrapped those buy hdb/ec near the LRT kena F upside/down Edited October 6, 2016 by Wt_know Link to post Share on other sites More sharing options...
Jellandross Supersonic October 6, 2016 Share October 6, 2016 (edited) Back when the LRT was built, you mean the double decker bus wasn't invented in the world yet meh? Why does this statement makes it sounds like double decker bus is a newer invention than the LRT ah? Based on this logic, why did they build all the other LRT systems in the first place? Since double decker bus has always been able to carry more passengers. "....a fully loaded high-capacity bus like a double-decker can take 130 passengers, which is more than the 105-person capacity of a single Bombardier train," he said. Edited October 6, 2016 by Jellandross 4 Link to post Share on other sites More sharing options...
Ghgan 6th Gear October 6, 2016 Share October 6, 2016 Lesson learn, is not to build a new LRT, but re-enforce the concrete track and run double-decker bus on it. Eliminate congestion, track signalling problem, track fault, kill 3 birds with one stone. Double-decker captain will be less stressful as no need to worry about traffic jam and will always arrive on time. hahaha. Back when the LRT was built, you mean the double decker bus wasn't invented in the world yet meh? Why does this statement makes it sounds like double decker bus is a newer invention than the LRT ah?Based on this logic, why did they build all the other LRT systems in the first place? Since double decker bus has always been able to carry more passengers."....a fully loaded high-capacity bus like a double-decker can take 130 passengers, which is more than the 105-person capacity of a single Bombardier train," he said. 1 Link to post Share on other sites More sharing options...
13177 Hypersonic October 6, 2016 Share October 6, 2016 Cannot solve the problem ... Scrapped it ... Would seem like an easy way not considering tax payer $ invested on the system.. Should scrap the pax instead for suggesting tat.. :( They never design a good and reliable train system in the first place and now waste tax payer money by saying scrap it. And no one dare to question them even another big mistake has made! Link to post Share on other sites More sharing options...
Angcheek Hypersonic October 6, 2016 Share October 6, 2016 Back when the LRT was built, you mean the double decker bus wasn't invented in the world yet meh? Why does this statement makes it sounds like double decker bus is a newer invention than the LRT ah? Based on this logic, why did they build all the other LRT systems in the first place? Since double decker bus has always been able to carry more passengers. "....a fully loaded high-capacity bus like a double-decker can take 130 passengers, which is more than the 105-person capacity of a single Bombardier train," he said. hahha good also they say , bad also they say .... 4 Link to post Share on other sites More sharing options...
Angcheek Hypersonic October 6, 2016 Share October 6, 2016 So many MRT problems. They all have to be scrapped also ! Shutdown everything, dismantle SMRT. wan to dismantle also dismantle their high pay useless head first ↡ Advertisement 10 Link to post Share on other sites More sharing options...
Recommended Posts
Related Discussions
Related Discussions
Public Urination in MRT Stations
Public Urination in MRT Stations
Public transport fare hike: Adults to pay 10 to 11 cents more per journey from Dec 23
Public transport fare hike: Adults to pay 10 to 11 cents more per journey from Dec 23
New stations, line extensions planned for Singapore’s MRT
New stations, line extensions planned for Singapore’s MRT
Consolidated Info on MRT/LRT Maintenance & Breakdown Part II
Consolidated Info on MRT/LRT Maintenance & Breakdown Part II
Penang fight scene garners 8mil views
Penang fight scene garners 8mil views
Johor Bahru-Singapore RTS link
Johor Bahru-Singapore RTS link
Electric van leasing firm EVCo declared insolvent with debts of close to $50m
Electric van leasing firm EVCo declared insolvent with debts of close to $50m