Jump to content

ALL consolidated SMRT/NEL/KT.. simisai BREAKDOWNS here!


New_Atlantis
 Share

Recommended Posts

Why you all like to compare SMRT with ERP??

 

ERP on for how long? MRT run for how long?

 

ERP during non-peak maintainence can take their time to check and re-check before it's turn on. What problems will it have?

Even have problems drivers won't comprain and news media won't pick it up either unless anyhow deduct money. The ppl affected got the same as the number of ppl affected by MRT trains breakdowns/delays?

 

ERP breakdown won't delay anyone like MRT. Cars still bypass the gantry w/o hassle.

Apple to apple comparison? Nope.

 

chill....... I think Jamesc is just being satirical  

 

relac! [thumbsup]

↡ Advertisement
  • Praise 2
Link to post
Share on other sites

chill....... I think Jamesc is just being satirical  

 

relac! [thumbsup]

 

Doesn't matter. I just want to point out that it doesn't make any sense making such comparisons. Hopefully ppl will stop saying the same thing over and over. It's making them look silly.

  • Praise 1
Link to post
Share on other sites

Hypersonic

Train fault on Circle Line causes delays for commuters on Friday morning.

 

SINGAPORE - Commuters were forced to endure crowded train platforms and travelling delays after a train fault hit the Circle Line on Friday (April 8) morning.

 

Rail operator SMRT first tweeted about the incident at 7.27am, informing commuters to expect 15 minutes of additional time travel between Dhoby Ghaut and Bishan MRT stations.

 

The fault was cleared about 10 minutes later, although SMRT warned of crowded trains and platforms.

  • Praise 3
Link to post
Share on other sites

Supersonic

Don't need to be so complicated la.... SMRT already has the right people for the job.

 

You ever seen the gantry breakdown?

Not sure. But gantry signal to the iu is reliable, consistent, rain or shine, jam or no jam, can manage high traffic signals flawlessly.
  • Praise 2
Link to post
Share on other sites

I am very glad all the bros and sis here understand

 

my posts are always meant to be silly

 

and that no one confuses me with the poster here

 

whose posts always makes him look down right stupid.

 

:D

 

 

  • Praise 4
Link to post
Share on other sites

So many people here make an effort

 

to try to explain to him and he still

 

doesn't understand.

 

:D

  • Praise 9
Link to post
Share on other sites

Train fault on Circle Line causes delays for commuters on Friday morning.

 

SINGAPORE - Commuters were forced to endure crowded train platforms and travelling delays after a train fault hit the Circle Line on Friday (April 8) morning.

 

Rail operator SMRT first tweeted about the incident at 7.27am, informing commuters to expect 15 minutes of additional time travel between Dhoby Ghaut and Bishan MRT stations.

 

The fault was cleared about 10 minutes later, although SMRT warned of crowded trains and platforms.

Ok everyone listen up. Don't be too extremely deeply overly concerned. Repeat after me....

 

Rise. In. Breakdowns. Means. Trains. Are. More. Reliable.

 

If still feeling very concerned, repeat the above mantra again until symptoms of unease disappear.

  • Praise 1
Link to post
Share on other sites

Twincharged

I am very glad all the bros and sis here understand

 

my posts are always meant to be silly

 

and that no one confuses me with the poster here

 

whose posts always makes him look down right stupid.

 

:D

 

Looking at your points, I think people here like silly posts more.  [laugh]

  • Praise 1
Link to post
Share on other sites

this thread is the reason, despite sky high coe, highest car price in the world, recession 2016/

 

still car are selling like hot cakes, <_<

  • Praise 4
Link to post
Share on other sites

Hypersonic

Seems like past week there were breakdown on different mrt line, from downtown, circle to EW line! Our mrt really super reliable! Lol.

  • Praise 1
Link to post
Share on other sites

Supersonic

Reliability in statistics and psychometrics is the overall consistency of a measure. A measure is said to have a high reliability if it produces similar results under consistent conditions.

  • Praise 1
Link to post
Share on other sites

Reliability in statistics and psychometrics is the overall consistency of a measure. A measure is said to have a high reliability if it produces similar results under consistent conditions.

 

The MRT can be consistently relied upon to breakdown.

 

The MRT can be relied upon to consistently breakdown.

 

 

Both machiam not wrong when applied to our train system in Singapore.

Link to post
Share on other sites

Reliability in statistics and psychometrics is the overall consistency of a measure. A measure is said to have a high reliability if it produces similar results under consistent conditions.

There is a Cp and CpK
Link to post
Share on other sites

today i am very grateful to SMRT for giving me a free 15mins sauna

 

due to aircon breakdown in the train packed with people

 

normally i would have to pay $200 a month to join a club to get steam bath

↡ Advertisement
Link to post
Share on other sites

Guest
This topic is now closed to further replies.
 Share

×
×
  • Create New...